How Long Does it Really Take to Remodel a Kitchen? Kitchen Makeover Madness

granite-counters

Spread The Word

Are you tired of looking at your outdated kitchen? You ready to give it a makeover and bring it into the modern era? Or maybe it’s just time to create something different?

The idea of giving your kitchen a complete overhaul probably sounds exciting. However, before you jump in and start tearing out old cabinets and installing new countertops, you may be wondering, “How long does a kitchen remodel take?”

A kitchen remodel can take anywhere from 6-12 weeks for a basic renovation that includes new cabinetry, countertops, and appliances, with no changes to the footprint or major plumbing or electrical work.

However, if the scope of the project is more complex, such as extensive structural changes, relocating plumbing and electrical service, and using custom cabinetry and imported products, the timeline can take anywhere from 3 weeks to 4 months.

The size of the kitchen, the complexity of the design, and the availability of materials and subcontractors all play a role in determining the overall timeline of a kitchen remodel project.

In this article, I will provide an overview of the typical process for a kitchen remodeling project so that you can plan accordingly.

By the way – before we get too far along here, if you want to connect with other homeowners and builders and get more great ideas for your home to make your space the best join my free private Facebook group, Remodel Reality here.

Average Length Of A Kitchen Remodel: The Basics

The time frame for a kitchen remodel varies greatly depending on the scope of the project. A full kitchen renovation, which includes a complete remodel of the entire kitchen, can take anywhere from 6-12 weeks on average. This time frame assumes that all materials and products have been ordered and are readily available, and that there are no significant delays due to unforeseen issues.

So that you have a little context, a kitchen remodel is 6-8 weeks for a regular kitchen renovation that includes new cabinetry, countertops, and appliances, with no changes to the footprint or major plumbing or electrical work.

This can take longer if the scope of the project is more complex, like including major changes to the footprint, relocating plumbing and electrical service, and using custom cabinetry and imported products. This can take anywhere from 3 weeks to 4 months.

However, if you’re planning on a more extensive kitchen remodel, like as adding a larger kitchen space or making structural changes, the timeline will obviously be longer. It’s also important to keep in mind that the size of your kitchen can play a role in determining the overall timeline, with a small kitchen typically taking less time than a larger one.

Ultimately, the kitchen remodel timeline can vary greatly, but it’s absolutely essential that you work with an experienced contractor and have a clear plan in place to ensure that things get done the right way and the project stays on schedule.

Factors that Affect the Time Frame of a Kitchen Remodel

Due to factors such as electricians, plumbers and other subcontractors needing to wait for the completion of certain tasks before beginning their own, each kitchen remodeling project is unique in terms of timeline and coordination.

And all this can easily take just a few weeks to a few months depending on the scope of the project and the experience of the general contractor who’s overseeing all the subs. For a general contractor who’s organized and has their act together, it can be a seamless experience.

The design process, which includes developing a new project design and ironing out all the details, can take a couple of weeks too. If you’re going to work with an interior designer or architect, you need to build in the time they need to the project too, and this can be something that can take a couple weeks to several months depending on what kind of work you’re doing with them.

The demolition process, which involves removing all the components of the old kitchen, can take a couple of days or more, especially if they’re removing flooring.

The installation process, which includes installing the new plumbing system, electrical wiring, cabinetry, and countertops, appliances, etc. can easily take anywhere from 6-8 weeks.

Renovating your kitchen completely, including making changes to the plumbing and electrical service, installing new appliances and products, and changing finishes, can take anywhere from 3-5 months, depending on the size and complexity of the project.

For minor cosmetic changes, like new cabinets, new granite countertops, and backsplash without changing floor plans, the job can be completed in a matter of weeks.

However, unforeseen circumstances like delays in obtaining permits, unexpected structural changes, or issues with the plumbing system can cause the project to take longer.

An experienced contractor with a solid construction schedule and years of experience can help ensure that the project is completed in a timely manner, but it is important to keep in mind that the scope of the work and the availability of materials also play a role in determining the overall timeline of the project.

Additionally, the materials used in kitchen renovations are often large, heavy and cumbersome, which can also add to the time required for the project.

The scope of your kitchen remodel in terms of both money and time will depend on the size and extent of the changes you want to make.

It’s important to establish a clear and realistic budget at the outset, place all material and product orders early, and make sure your design-build team has all of the product specifications before demolition begins. Build-in some time for situations like product back-orders or subcontractor availability. This can help to keep your kitchen remodel on schedule and minimize delays.

Also, don’t forget, if you’re planning on living in your home during your remodel, planning a project around other commitments like piano lessons, dog walks or nap times will slow down the progress.

When renovating, you have to understand that there will be inevitable disruptions to their daily routine.

Therefore, it’s important to consider the amount of time you will be without a functional kitchen and plan accordingly.

During our kitchen renovation, we were without a functional kitchen (including not having running water!) for a few weeks and it was a very challenging process that we weren’t prepared for.

Best Practices for Keeping a Kitchen Remodel on Schedule

When it comes to keeping your kitchen remodel on schedule, there are a few best practices to keep in mind. The first step is to establish a clear and realistic budget from the outset.

I can’t tell you how important clear budgets and limits are.

Change requests are really bad for two main reasons: They can destroy your budget faster than ice will melt in Florida in July, and they will derail your progress resulting in massive timeline changes.

Changes to the scope of the project once construction has begun, is very often the cause for delays.

This will help you ensure that you have enough money to cover all of the materials and labor needed for your project, and it will also help you avoid any unexpected costs or delays.

It’s also important to place all of your material and product orders early on, so that you can avoid any delays due to back-orders or other supply chain issues, because that tile you want may be wanted by a lot of other people too and it’s easy for vendors to be out of stock on items you need.

Another key to keeping your kitchen remodel on schedule is to ensure that your design-build team has all of the product specifications before demolition begins.

This will help ensure that all of the materials and products needed for your project are on hand and ready to go when construction begins.

Additionally, it’s a good idea to build in some extra time for situations like product back-orders or subcontractor availability, as these can often cause delays.

Avoid making any changes to the scope of the project once construction has begun if at all possible.

This is the situation where you want to do all your due diligence up front, check and double-check, and check again, then once you’re 100% sure on everything, only then get started with the project.

This is such a huge source of delays, because the entire schedule has to be rearranged to build in additional time and resources to make the necessary adjustments.

By following these best practices, you can help ensure that your kitchen remodel stays on schedule and is completed on time.

Preparing for a Kitchen Remodel

Preparing for your kitchen remodel is crucial in ensuring that the project runs smoothly and that the final result is exactly what you want. Before starting your kitchen remodel, it’s important to consider several factors to make sure it meets your needs and stays within your budget.

The first step in preparing for your kitchen remodel is to brainstorm your dream kitchen. This is the part that pretty much everyone starts with: you watch that home improvement show on HGTV and your mind starts to race with ideas on what’s possible. If you’re like us, we had been kind of formulating our plan over the course of several months for what we wanted to do.

Think about how you want to use it, whether you want new appliances, and what parts of your existing kitchen you want to keep. This will give you a clear idea of what you want to achieve with your remodel.

Next, identify the current pain points in your kitchen. What are the problems that you currently have with your kitchen? Is the layout not working for you? Are the appliances outdated? Identifying these pain points will help you prioritize what needs to be done during the remodel.

Once you have identified your ideal kitchen and current pain points, it’s time to decide on an ideal layout. Consider how you use your kitchen and how you want to use it in the future. Think about the flow of the space and how you want to move through it. This will help you create a functional and efficient kitchen.

After you have decided on an ideal layout, it’s important to list your wants, must-haves, and deal-breakers. What are the things that you absolutely want in your new kitchen? What are the things that you can live without? And what are the things that would make or break the project for you? This will help you stay focused and avoid costly changes later on.

Determining a budget is an essential step when preparing for your kitchen remodel. It’s important to know how much money you have to spend before you begin the project. This will help you prioritize what needs to be done and what can be done later. Before you decide on a budget, consider whether or not there are parts of your existing kitchen that can be salvaged, like refinished cabinets or repurposed countertops. Salvaging existing elements can save you money and reduce the amount of time the remodel takes.

The Kitchen Remodel Process

The kitchen remodel process can be a daunting task, but with the right team and plan in place, it can be a smooth and enjoyable experience. The first step in the process is the initial meeting, where you will discuss your vision for your new kitchen with your contractor and begin to develop a plan. Next, a home visit will take place, where the contractor will assess the current state of your kitchen and provide you with a more detailed proposal.

Once the proposal is accepted, the design agreement and workshop will take place. This is where the final design for your new kitchen will be created and all the details will be ironed out. Once the design is complete, the contract will be signed and the installation process can begin.

The installation process is where the bulk of the work will take place, and it’s important to note that disruptions to your daily lifestyle should be expected. But with the right team, the process will be managed efficiently and with minimal inconvenience to you. Once the installation is complete, the post-construction phase will begin. This is where the final details are taken care of, like cleaning up, obtaining final sign-offs, and making any necessary repairs or adjustments. This phase will ensure that your kitchen is fully functional and meets your satisfaction.

Here’s a basic breakdown of the step-by-step process for what the kitchen remodel process looks like:

Initial Planning Stage:

  • Brainstorm your dream kitchen and think about how you want to use it, what new appliances you want, and what parts of your existing kitchen you want to keep.
  • Identify the current pain points in your kitchen and prioritize what needs to be done during the remodel.
  • Decide on an ideal layout for your kitchen, considering the flow and functionality of the space.
  • List your wants, must-haves, and deal-breakers for your new kitchen.

Design Phase:

  • Initial meeting with contractor to discuss your vision for your new kitchen and begin to develop a plan
  • Home visit by contractor to assess the current state of your kitchen and provide a more detailed proposal
  • Design agreement and workshop to create the final design for your new kitchen and iron out all the details
  • Signing of contract

Installation Phase:

  • The bulk of the work will take place during this phase and disruptions to your daily lifestyle should be expected
  • With the right team in place, the installation process will be managed efficiently and with minimal inconvenience
  • The installation of structural changes, electrical wiring, and extensive plumbing will take place
  • Installation of new kitchen cabinets, countertops, appliances, and light fixtures
  • Installation of new flooring, if desired

Post-construction Phase:

  • Final details like cleaning up, obtaining final sign-offs, and making any necessary repairs or adjustments
  • This phase will ensure that your kitchen is fully functional and meets your satisfaction
  • Obtaining final inspection and permits as required
  • Finally, you can enjoy your new kitchen

Average Time Frame for a Kitchen Remodel

When it comes to the average time frame for your kitchen remodel, it’s important to keep in mind that every project is unique. However, there are some general guidelines that can give you a rough idea of what to expect. A regular kitchen renovation that includes new cabinetry, countertops, and appliances, with no changes to the footprint or major plumbing or electrical work, can typically take between 6-12 weeks. This time frame assumes that all materials and products have been ordered and are readily available, and that there are no significant delays due to unforeseen issues.

However, if the scope of the project is more complex, the time frame can be longer. For example, a kitchen renovation that includes major changes to the footprint, relocating plumbing and electrical service, and using custom cabinetry and imported products can take anywhere from 3 weeks to 4 months. The size of the kitchen, the complexity of the design, and the availability of materials and subcontractors all play a role in determining the overall timeline.

It’s also important to note that there are factors that can expedite or delay a kitchen remodel.

For example, if you have a clear plan, budget, and the right team in place, the project can often be completed more quickly.

On the other hand, if the scope of the project changes frequently or there are delays in obtaining necessary permits and approvals, it can take longer to complete the renovation. By being aware of these potential factors and taking steps to mitigate them, you can help to ensure that your kitchen remodel stays on schedule.

Here’s an example of a timeline for a kitchen remodel project:

Step Description Time Required
Planning and Design Assemble kitchen remodeling ideas and go over them with architect, interior designer, and contractor. Order materials. 1 month
Demolition Remove old kitchen from house. 1-2 weeks
Structural Work Make changes to the footprint of the kitchen, like taking out a wall. 3 days – 1 week
Utility Work Make changes to water lines, drains, electrical outlets, or gas lines. 2-5 days
Painting Paint kitchen before cabinets are installed. 1-2 days
Flooring Install new flooring, like laminate, tile, or hardwood. 2-5 days
Cabinets and Countertops Install new cabinets and countertops. 1-2 weeks
Appliances Install new appliances. 1-2 days
Final Touches Add finishing touches, like backsplash and lighting. 1-2 days
Post-Construction Clean up, make any necessary repairs or adjustments, and obtain final sign-offs. 1-2 days

Please keep in mind that these time estimates will vary according to the size and complexity of a kitchen remodeling project. Moreover, the completion timeline of a project may be impacted by factors like supply chain problems, unexpected obstacles, and modifications to its scope.

Next Steps

Want to join others who are creating the most amazing home redesigns & renovations and get more tips, tricks and hacks on how to make your home the best it can be?

Join my brand new free private Facebook group, Remodel Reality to connect with other people like you to make your space the best!

Trending Articles

Dive into more home improvement stories below. One of these trending articles might just be the right solution for your problem or inspire your next project's breakthrough.

Posted in

Rob Orr

Me and my family have lived through a nightmare of a remodeling project gone wrong, making countless mistakes including placing trust in the wrong hands. Despite these setbacks, we took matters into our own hands for many aspects of the remodel, ensuring quality workmanship guided by expert advice. Through my personal experiences, I've created RemodelReality.com. My mission is not only to share the pitfalls we encountered but also the successes we achieved by combining our efforts with trusted professionals. By sharing both the highs and lows of our journey, I aim to help others navigate their own remodeling projects with greater confidence, ensuring they benefit from our lessons learned.